Overhaul of a steering gear HPU
Full recovery of the hydraulic power unit driving the rudder, with pump replacement and contamination brought back within specification.
Read the case studyTechnical portfolio
Each case documents the problem found, the engineering decision taken and the indicator that proves the result delivered.
Real cases
12 results
Full recovery of the hydraulic power unit driving the rudder, with pump replacement and contamination brought back within specification.
Read the case studyManufacture of a transmission shaft for discontinued equipment, worked up from the fractured component with no manufacturer drawing available.
Read the case studyComplete overhaul of a mooring winch with drum recovery, hydraulic drive overhaul and load testing.
Read the case studyInternal clearances recovered and wear rings manufactured, with the duty curve restored and proven on the test bench.
Read the case studyContamination in a hydraulic system brought back within specification after repeated proportional valve failures.
Read the case studyOverhaul of davit actuating cylinders with rod re-chroming and leak testing under load.
Read the case studyDiagnosis of excessive vibration and reinforcement of the base, with alignment and levelling corrected.
Read the case studyReplacement of corroded sections of the firefighting main, with workshop prefabrication and hydrostatic testing.
Read the case studyModernisation of the hydraulic steering drive, keeping the vessel's original structural interfaces.
Read the case studyDimensional recovery of a bearing housing without stripping the equipment, with a compensating bush manufactured to suit.
Read the case studyComplete maintenance of a firefighting pump set, with performance testing and a compliance dossier.
Read the case studyRecovery of an eroded seat by weld build-up in a compatible material and re-machining to the original dimension.
Read the case studyNo projects in this category Try another discipline, or talk to our team about your particular case.
How we document our work
Standardised documentation is what makes it possible to compare interventions, build the equipment history and stand up to technical audits.
The problem that prompted the intervention and the operational constraint involved.
What was contracted, with a clear boundary between what is and is not included.
The sequence applied and the engineering decisions taken during the work.
The measured indicator that proves the delivery — not a subjective assessment.
Technical support
Most of these projects started with a description of a symptom and a shutdown window. Describe your situation and we will assess the engineering route.