The objective of the intervention

WF Service carried out the complete maintenance of a winch fitted with a double band brake and pneumatic actuation. The purpose of the intervention was to restore the equipment to working order, recover the braking system, replace the wear components and make the necessary adjustments, giving greater operational reliability and returning the winch to proper working condition.

Scope carried out

  • Strip-down of the winch assembly
  • Inspection of the mechanical components
  • Assessment of the braking system
  • Replacement of the brake linings
  • Maintenance and necessary adjustments to the brake assembly
  • Check of the pneumatic actuation system
  • Adjustment of the components involved in the actuation
  • Reassembly of the equipment after maintenance
  • Check of the operation of the assembly
  • Functional testing after reassembly

Technical highlights

The key points of the intervention

Braking system

Maintenance of the double band brake assembly and replacement of the worn linings.

Pneumatic actuation

Check and adjustment of the system that actuates the equipment.

Mechanical maintenance

Strip-down, inspection, recovery, reassembly and adjustment of the winch components.

Functional testing

Once the maintenance was complete, the equipment went through checks and tests to confirm the assembly was working properly.

Execution

The sequence applied to the winch maintenance

The order below reproduces how the work was actually carried out, including the points where the condition found required a change of scope.

  1. Strip-down and inspection. The winch assembly was stripped down to assess the condition of the components, with the mechanical components inspected and the items needing maintenance, replacement or adjustment identified.
  2. Assessment of the braking system. The double band brake assembly was assessed to define the maintenance required and the wear elements to be replaced.
  3. Replacement of the brake linings. The brake linings were replaced, and the brake assembly received the necessary maintenance and adjustment.
  4. Pneumatic actuation. The pneumatic actuation system was checked, and the components involved in the actuation were adjusted.
  5. Reassembly. With the maintenance complete, the equipment was reassembled.
  6. Operational check and functional testing. After reassembly, the operation of the assembly was checked and the equipment went through functional testing.

Result

What the intervention delivered

The work focused on restoring the operating condition of the equipment, ensuring the correct operation of the winch braking system and actuation. It went well beyond replacing the linings: the intervention covered strip-down, inspection, maintenance of the brake assembly, adjustment of the pneumatic actuation and reassembly; finally, the equipment went through checks and functional testing to confirm the assembly was working properly.

Photographic record

Photographic record of the intervention

The sequence below follows the winch maintenance, from the removal of the brake bands to the reassembled equipment.

The two brake bands removed from the winch, laid out on deck

The two brake bands removed from the winch, laid out on deck

Portfolio

Other completed projects

View all

Marine 2026 7 days

Manufacture of a sheave for a brake unit

Manufacture of a sheave for a brake unit, machined from the dimensions of the damaged original component, with dimensional inspection and a compatibility check before fitting.

Read the case study

Technical support

Need to bring a piece of equipment back into service?

Tell us the condition of the equipment and the window you have available. Our engineering team will come back with an assessment and a preliminary scope of work.

Request a quote

Emergencies: 24/7 response on request