Overhaul of a steering gear HPU
Full recovery of the hydraulic power unit driving the rudder, with pump replacement and contamination brought back within specification.
Read the case studyMachining · Industrial
Dimensional recovery of a bearing housing without stripping the equipment, with a compensating bush manufactured to suit.
Execution
The order below reproduces how the work was actually carried out, including the points where the condition found required a change of scope.
Comparison
Drag the slider to switch between the two recorded conditions.
Result
The recovery was completed in five days, without stripping the equipment and inside the shutdown window available. Sending the unit to a workshop would have meant at least three weeks out of service.
Photographic record
The photographic record forms part of the technical report handed to the client and feeds the equipment history.
Portfolio
Full recovery of the hydraulic power unit driving the rudder, with pump replacement and contamination brought back within specification.
Read the case studyManufacture of a transmission shaft for discontinued equipment, worked up from the fractured component with no manufacturer drawing available.
Read the case studyComplete overhaul of a mooring winch with drum recovery, hydraulic drive overhaul and load testing.
Read the case studyTechnical support
Tell us the condition of the equipment and the window you have available. Our engineering team will come back with an assessment and a preliminary scope of work.