Recovery of a cargo pump losing efficiency

Internal clearances recovered and wear rings manufactured, with the duty curve restored and proven on the test bench.

Discipline
Pumps
Sector
Offshore
Location
WF Service workshop
Year
2024
Duration
7 days

Objective

The problem that prompted the intervention

The pump was running below its rated flow and drawing excessive power, forcing the operation to keep a second unit running in parallel to meet system demand.

Contracted scope

  • Strip-down and full inspection
  • Measurement of internal clearances and wear assessment
  • Manufacture of wear rings
  • Recovery of the impeller and shaft
  • Replacement of the mechanical seal and bearings
  • Bench performance testing

Execution

The sequence applied and the engineering decisions taken

The order below reproduces how the work was actually carried out, including the points where the condition found required a change of scope.

  1. Strip-down with the condition found on record and every internal clearance measured.
  2. Wear ring clearance found to be far above the design value — the direct cause of internal recirculation and the loss of efficiency.
  3. New wear rings manufactured in our own machine shop, in a material suited to the fluid being pumped.
  4. Recovery of the impeller and the shaft seat, restoring the design dimensions.
  5. Replacement of the mechanical seal, bearings and seals.
  6. Reassembly with the rotating assembly balanced.
  7. Bench performance test with pressure, flow and vibration recorded.

Comparison

Condition before and after the intervention

Drag the slider to switch between the two recorded conditions.

Condition of the equipment after the intervention
Condition of the equipment before the intervention
Before After
Before
Flow below rated, high power draw and the need to run two pumps in parallel.
After
Duty curve restored and demand met with a single unit.

Result

What the intervention delivered

The pump returned to its specified duty curve, demonstrated on the test bench. The operation now meets demand with a single unit, releasing the second pump as a genuine standby and lowering the system's energy consumption.

7 days in the workshop
1 unit released to standby
100% of the duty curve restored

Photographic record

Job gallery

The photographic record forms part of the technical report handed to the client and feeds the equipment history.

Portfolio

Other completed projects

Ver todos

Marine 2024 11 days

Overhaul of a steering gear HPU

Full recovery of the hydraulic power unit driving the rudder, with pump replacement and contamination brought back within specification.

Read the case study

Technical support

Need to bring a piece of equipment back into service?

Tell us the condition of the equipment and the window you have available. Our engineering team will come back with an assessment and a preliminary scope of work.

Request a quote +55 21 97518-8627

Emergencies: 24/7 response on request